Sunday, January 25, 2009
Blog Reader Requests
Tuesday, April 15, 2008
Update
Blessings,
Tuesday, October 23, 2007
Hold Tight
Tuesday, October 9, 2007
Basement News
The Wirsbo tubing has been installed in my basement.
These two (Jouster and The King) installed it last night.
It was not easy getting to this point.
The King had to remove 1 1/2 inches of gravel/dirt before he could lay the foam. Three days of work and the dirt was gone.
He got the foam insulation laid...and taped together. Then it rained. We had water in the basement. A call to the waterproofers forced The King to pull up the foam insulation and place a layer of poly over the dirt. Back down with the foam. He was finally able to lay the tubing.
The best news is that he said we would be pouring cement THIS FRIDAY.
Nothing happens as planned. The cement guy can't make it Friday. He has to come THURSDAY instead. Yippee!! Cement more than a month before my 20th anniversary! That means only one thing. It can't be my anniversary present. Remember, I was holding out for cement as my anniversary gift. But now that the cement will be done 48 days before our big day, I am pretty sure I can squeeze something else out of The King.
Here's my plan:
1. About the first of November I will start hinting that our anniversary is coming up.
2. I will nonchalantly ask The King what kind of amazing gift he wants from me.
3. Giddily tell him I can't wait to see what surprise(s) he has in store for me.
4. Remind him that I love jewelry. If he gives me 'the look', I will add that I like kitchen appliances and vacuum cleaners just as well.
5. Convince him that since the weather is now turning cold, he would really enjoy a tropical vacation...with me, of course. If I get 'the look', I will mention that it would also be fun to get away for one night without the kids.
6. Take the check book out of my purse and leave it on the kitchen counter for him to see. If he doesn't notice it there, I will put it on the keyboard of his computer.
7. Occasionally tell him he looks likes he's been up to something.
Any other ideas? Do you think my plan will work? I'll keep you posted.
Saturday, September 29, 2007
Indoor Pool Removed
Our waterproofing in the basement is finally complete.
No more indoor pool.
No more musty smell.
No more moldy storage.
Isn't this a beautiful sight? It's my new sump pump. I think The King is trying to figure out how he could trick me into believing this waterproofing is my 20th wedding anniversary gift. Our anniversary is coming up in November.
Cement. A new floor.
I told you I was high maintenance.
Sunday, September 16, 2007
Moving Radiators.....
The pipes from the furnace to the heaters were cut. There was no reason the heaters couldn't be moved, right?
When we sanded and finished the floors in 2000, there was no way we could sand under the heaters. There had been carpeting that had been glued to the floors, so it was a rough under them and very hard to get clean and keep clean. A thorn in my side.
The King graciously pulled out two 500+ pound heaters and started to sand the floor. The palm sander was taking forever.
I let it dry, then used the palm sander to sand under BOTH heaters. I didn't dare ask him to go back to town and re-rent the big tool. I then applied the appropriate polyurethane. I didn't stop there, I even painted the baseboards behind the heaters that no one will ever see.
So come on over, look under my heaters, I don't care. They are clean! Clean I tell you! (Come quick, clean doesn't last long here.) The thorn in my side is gone!!!
Can you see how one thing leads to another?
Stay tuned. We're still not done.
Hey, Let's Cut Those Out....
More Insanity. Stay tuned. It gets better.
(Read Next: Moving Radiators....)
Then The Water Came.....
Our waterproofers were put on hold. An emergency septic crew came in and installed a new septic system. All seemed well for a few days, until The King suspected a problem. Two of the three new septic tanks that had just been installed were cracked and ground water was seeping into them. One week after the first new septic system was put in, it had to be dug up, and replaced with an even newer one.
Oh, the basement insanity. Stay tuned. There's more.
(Read Next: Hey Let's Cut Those Out....)
It All Started When....
We called in the waterproofing experts. They told us they needed to remove a lot of the concrete floor to put in tiles and then they'd patch over their holes. It was smarter for us to remove the entire floor so we could plumb in the bathroom when they waterproofed. The King jackhammered until he was numb. We hauled the floor out of the basement one five gallon bucket at a time. That was the first big project.
"Hey honey, maybe we should remove this 18 foot long by 8 foot tall by 12 inch wide concrete wall while we're at it. It will really open up the room." More jackhammering. The wall was hauled out of the basement one five gallon bucket at a time. That was the second big project.
This was only the beginning. Stay tuned for more Basement Insanity....
(Read Next: Then The Water Came....)